UPPCL Electricity Connection Online Application Form 2016 Scheme

UPCL New Electricity Connection Form 2016

UPPCL Electricity Connection Online Application Form 2016 Scheme Bijli Light bill payment Application Domestic Commercial how to apply online closed documents home UPPCL New Electricity Connection 2016 required Uttar Pradesh Power Corporation

UPPCL Electricity Connection Scheme 2016  Online Application Form Yojana Electricity Connection Form booking procedure Technical requirements for effecting new connection and drawing of space required for UPPCL Electricity Connection Form domestic commercial it is applicable to premises used by industrial consumers and residential / residential-cum-commercial premises of more than 100 flats and/or 60,000 sqft Floor area. The intending consumer shall receive the signed and dated receipt with office seal for Earnest Money and application. Meter space should be provided on pacca wall

Before apply online for UPPCL bijli new electricity connection Wiring has been tested by the said contractor to my satisfaction. The electrical wiring has been got done with standard/ISI marked material through an experienced electrical contractor licensed in this behalf by the Government of Uttar Pradesh or private media which is approved and under the direct supervision of a person of holding a certificate of competency and holding the concerned permit from the Government.

UPPCL electricity Connection documents required for new electricity connection in up certificate (s) of bonafide occupation or ownership of a premises through any one of the documents such as Passport, Voter Identity Card, Rent Bill, Rent Control Challan, Telephone Bill, Municipal or any other Tax Bill, Ration Card, Certificate from Panchayat, any other documents issued by any Ministry or Department of Government showing his occupancy of the premises applied for etc.

Uttar Pradesh State Electricity Distribution Company Limited Group Electric Supply

Applicable Class of Consumers
(i) Domestic (Rural)
(ii) Domestic (Urban)
(iii) Commercial (Rural)
(iv) Commercial (Urban)
(v) Irrigation
(vi) Commercial Plantation.
(vii) Short Term Irrigation Supply
(viii) Short Term supply for Commercial Plantation
(ix) Short-term supply
(x) Public Utility / Specified Institutions / Public Bodies, as applicable.
a) In Municipal area
b) In Non-Municipal area
(xi) Cottage Industry / Artisan / Weavers / Small production oriented establishment not run by
electricity as motive power
(xii) Poultry, Duckery, Horticulture, Tissue culture Floriculture, Herbal – Medicinal – Biodiesel Plant Farming, Food Processing Unit
(xiii) Public Water Works & Sewerage System
(xiv) Industries
a) Rural
b) Urban
(xv) Street Lighting
(xvi) Private Educational Institutions & Hospitals
(xvii) Emergency
(xviii) Construction Power
(xix) Bulk supply at single point, inter-alia, to Co-operative Group Housing Society for
providing power to its members or person, for providing power to its employees in a
single premises
(xx) Common Services of Industrial Estate

UPPCL New connection bijli Technical requirements for effecting new connection

1) Space required for installation of single phase meter for providing power supply to Low and Medium Voltage intending consumers having connected load upto 6 KW
a) Space required for installation of meter should be provided at an easily accessible location of the premises which should be free from any hindrances.
b) It should be properly illuminated for taking meter reading.
c) The intending consumer is to provide a space of size 2.5 ft length and height 5.5 ft for installation of meter, main switch, cutouts, earth bars etc on 10 inches concrete wall. In case of Kaccha house, a separate meter room of size 3ft(length) x 4ft(breath) x 6.5ft(height) is to be provided.
d) Earthing arrangement should be provided near the meter by the intending consumers as per IE rules.

Space required for installation of three phase meter for providing power supply to Low and Medium Voltage intending consumers having connected load less than 50 KVA
a) Space required for installation of meter should be provided at an easily accessible location of the premises which should be free from any hindrances.
b) It should be properly illuminated for taking meter reading.
c) The intending consumer is to provide a space of size 4 ft length and height 5.5 ft for installation of meter, main switch, cutouts, earth bars etc.
d) Earthing arrangement should be provided near the meter by the intending consumers as per IE rules.

Application form for new electricity connection in UPPCL

LT Three Phase Static Kwh meter , Tri-vector meter ,Bi-vector meter , AMR/AMI Compliant 
The meter rents Reconnection Charges and Type of Meter Monthly Meter Rent
1. Single phase electro-magnetic Kwh meter 20 2. Three phase electro-magnetic Kwh meter 40 LT Single Phase Domestic Consumer Rs.150/-
3. Three phase electro-magnetic tri-vector meter LT Single Phase other Consumer
4. Tri-vector meter for Railway Traction 1000 LT 3 Phase consumers Rs.600/-
5. Single phase Static Kwh meter 40 All HT & EHT consumers Rs.3000/-

documents required for new electricity connection for commercial, industry and domestic connection for Home uses

1. Application Form, Form – I.
2. One Passport photo.
3. Xerox copy of Money Receipt against deposit of processing fees.
4. Copy of the Treasury Challan towards deposit of inspection fees of Electrical Inspector, Photo Ration Card copy of Money Receipt, if deposited in CESU.
5. Attested copy of land document. (Patta/Dalil/Affidavit) where power supply is to be effected.
6. Photo identification for urban consumers like Ration card, Voter ID card, Driving License, Pan Card, Pass Port etc.
7. Copy of the Approved Building/ Site plan from local bodies/ Development Authorities like BDA / CDA/ PKIET etc.
8. Certificate from village Pradhan or any village level Govt. functionary like Patwari/Lekhpal/village level worker/village Chowkidar/Primary school teacher/in-charge of primary health centre etc
9. Xerox copy of previous month bill in case of subsequent service connections for verification of no dues.
10. Test certificate from a licensed Electrical contractor before effecting power supply.

new light connection products how to write application for electricity connection

1 Tube light
2 Incandescent lamp
3 Table fan / Fan (36")
4 Fan (48")
5 Fan (56")
6 Air Circulator
7 Music System
8 Television
9 Mixer Grinder
10 Electric Iron
11 Fridge
12 Cooler
13 Heater for cooking (according to physical availability)
14 Heater (for water heating)
15 Microwave oven
16 Washing machine
17 Kitchen Exhaust Chimney
18 Aqua guard water filter
19 Air Conditioner (1Ton)
20 Air Conditioner (1.5 Ton)
21 Geyser
22 Pump set (0.5HP)
23 Personal Computer/ Monitor & Printer
24 Industrial appliance
25 Other item (if any)

UPPCL Sample letter for new electricity connection all above is also applicable in Delhi, Mumbai, Kerala, Bihar, Madhya Pradesh, Tamil Nadu, Bengalore, Lucknow, Noida, Rajasthan, Jammu Kashmir, etc