UPPCL Electricity Connection Online Application Form 2016 Scheme
UPCL New Electricity Connection Form 2016
UPPCL Electricity Connection Online Application Form 2016 Scheme Bijli Light bill payment Application Domestic Commercial how to
apply online closed documents home UPPCL New Electricity Connection 2016
required Uttar Pradesh Power Corporation
UPPCL Electricity Connection Scheme 2016 Online Application Form Yojana Electricity Connection Form booking procedure Technical requirements for effecting new
connection and drawing of space required for UPPCL Electricity Connection Form
domestic commercial it is applicable to premises used by industrial consumers
and residential / residential-cum-commercial premises of more than 100 flats
and/or 60,000 sqft Floor area. The intending consumer shall receive the signed
and dated receipt with office seal for Earnest Money and application. Meter
space should be provided on pacca wall
Before apply online for UPPCL bijli new electricity connection
Wiring has been tested by the said contractor to my satisfaction. The electrical wiring has been got done
with standard/ISI marked material through an experienced electrical contractor
licensed in this behalf by the Government of Uttar Pradesh or private media
which is approved and under the direct supervision of a person of holding a
certificate of competency and holding the concerned permit from the Government.
UPPCL electricity Connection documents required
for new electricity connection in up certificate (s) of bonafide occupation or
ownership of a premises through any one of the documents such as Passport,
Voter Identity Card, Rent Bill, Rent Control Challan, Telephone Bill, Municipal
or any other Tax Bill, Ration Card, Certificate from Panchayat, any other
documents issued by any Ministry or Department of Government showing his
occupancy of the premises applied for etc.
Uttar Pradesh State
Electricity Distribution Company Limited Group Electric Supply
Applicable Class of Consumers
(i) Domestic (Rural)
(ii) Domestic (Urban)
(iii) Commercial (Rural)
(iv) Commercial (Urban)
(v) Irrigation
(vi) Commercial Plantation.
(vii) Short Term Irrigation Supply
(viii) Short Term supply for Commercial Plantation
(ix) Short-term supply
(x) Public Utility / Specified Institutions / Public Bodies,
as applicable.
a) In Municipal area
b) In Non-Municipal area
(xi) Cottage Industry / Artisan / Weavers / Small production
oriented establishment not run by
electricity as motive power
(xii) Poultry, Duckery, Horticulture, Tissue culture
Floriculture, Herbal – Medicinal – Biodiesel Plant Farming, Food Processing
Unit
(xiii) Public Water Works & Sewerage System
(xiv) Industries
a) Rural
b) Urban
(xv) Street Lighting
(xvi) Private Educational Institutions & Hospitals
(xvii) Emergency
(xviii) Construction Power
(xix) Bulk supply at single point, inter-alia, to
Co-operative Group Housing Society for
providing power to its members or person, for providing
power to its employees in a
single premises
(xx) Common Services of Industrial Estate
UPPCL New connection bijli
Technical requirements for effecting new connection
1) Space required for installation of single phase meter for
providing power supply to Low and Medium Voltage intending consumers having
connected load upto 6 KW
a) Space required for installation of meter should be
provided at an easily accessible location of the premises which should be free
from any hindrances.
b) It should be properly illuminated for taking meter
reading.
c) The intending consumer is to provide a space of size 2.5
ft length and height 5.5 ft for installation of meter, main switch, cutouts,
earth bars etc on 10 inches concrete wall. In case of Kaccha house, a separate
meter room of size 3ft(length) x 4ft(breath) x 6.5ft(height) is to be provided.
d) Earthing arrangement should be provided near the meter by
the intending consumers as per IE rules.
Space required for installation of three phase meter for
providing power supply to Low and Medium Voltage intending consumers having
connected load less than 50 KVA
a) Space required for installation of meter should be
provided at an easily accessible location of the premises which should be free
from any hindrances.
b) It should be properly illuminated for taking meter
reading.
c) The intending consumer is to provide a space of size 4 ft
length and height 5.5 ft for installation of meter, main switch, cutouts, earth
bars etc.
d) Earthing arrangement should be provided near the meter by
the intending consumers as per IE rules.
Application form for
new electricity connection in UPPCL
LT Three Phase Static Kwh meter , Tri-vector meter
,Bi-vector meter , AMR/AMI Compliant
The meter rents Reconnection Charges and Type of Meter
Monthly Meter Rent
1. Single phase electro-magnetic Kwh meter 20 2. Three phase
electro-magnetic Kwh meter 40 LT Single Phase Domestic Consumer Rs.150/-
3. Three phase electro-magnetic tri-vector meter LT Single
Phase other Consumer
4. Tri-vector meter for Railway Traction 1000 LT 3 Phase
consumers Rs.600/-
5. Single phase Static Kwh meter 40 All HT & EHT
consumers Rs.3000/-
documents required for new electricity connection for
commercial, industry and domestic connection for Home uses
1. Application Form, Form – I.
2. One Passport photo.
3. Xerox copy of Money Receipt against deposit of processing
fees.
4. Copy of the Treasury Challan towards deposit of
inspection fees of Electrical Inspector, Photo Ration Card copy of Money
Receipt, if deposited in CESU.
5. Attested copy of land document. (Patta/Dalil/Affidavit)
where power supply is to be effected.
6. Photo identification for urban consumers like Ration
card, Voter ID card, Driving License, Pan Card, Pass Port etc.
7. Copy of the Approved Building/ Site plan from local
bodies/ Development Authorities like BDA / CDA/ PKIET etc.
8. Certificate from village Pradhan or any village level
Govt. functionary like Patwari/Lekhpal/village level worker/village Chowkidar/Primary
school teacher/in-charge of primary health centre etc
9. Xerox copy of previous month bill in case of subsequent
service connections for verification of no dues.
10. Test certificate from a licensed Electrical contractor
before effecting power supply.
new light connection products
how to write application for electricity connection
1 Tube light
2 Incandescent lamp
3 Table fan / Fan (36")
4 Fan (48")
5 Fan (56")
6 Air Circulator
7 Music System
8 Television
9 Mixer Grinder
10 Electric Iron
11 Fridge
12 Cooler
13 Heater for cooking (according to physical availability)
14 Heater (for water heating)
15 Microwave oven
16 Washing machine
17 Kitchen Exhaust Chimney
18 Aqua guard water filter
19 Air Conditioner (1Ton)
20 Air Conditioner (1.5 Ton)
21 Geyser
22 Pump set (0.5HP)
23 Personal Computer/ Monitor & Printer
24 Industrial appliance
25 Other item (if any)
UPPCL Sample letter for new electricity connection all above is also applicable in Delhi, Mumbai, Kerala, Bihar, Madhya Pradesh, Tamil Nadu, Bengalore, Lucknow, Noida, Rajasthan, Jammu Kashmir, etc